Developing a High Voltage ELD Specification for Your Roof

Before an electronic leak detection (ELD) specification goes out for bid, the project team needs to know whether the roof assembly supports the proposed test, when testing will occur and who will handle repairs and verification. Resolving those details early gives bidders a clearer scope and helps the construction team coordinate the work.
Honza Group focuses on high-voltage ELD, using low voltage when field conditions dictate or an existing project specification calls for it. We work with design and construction teams to develop testing requirements around the roof assembly, construction sequence and owner’s plans.
Turn Project Requirements Into a Clear Scope
Define the testing scope before bidding so responsibilities and expectations are clear. Your specification should address:
· Testing coverage, including roof areas, details and exclusions.
· Site preparation, dry surface conditions and access to the membrane for high-voltage testing.
· Testing milestones and coordination before the membrane is covered.
· Repair responsibilities, verification and any return visits.
· Protection after testing and work that may justify another survey.
· Reporting requirements and documentation of unresolved findings.
Clear requirements give the project team a shared basis for planning the work. For more on construction milestones, see ELD During Construction
See What the High Voltage Example Specifications Cover
Initial testing. Our high-voltage example addresses preparation, testing procedures and reporting. High-voltage testing requires a dry surface, and the membrane and roof assembly must be compatible with the method. Confirm those conditions before finalizing the scope.
Provisions for future testing. Our high-voltage future-testing example addresses components left in place and the layouts and records that support later surveys. Whether those provisions belong in your project depends on the owner’s plans and how roof access will change. They do not, by themselves, provide continuous monitoring.
Specialized roof assemblies. A nonconductive deck or an assembly with a vapor retarder needs additional consideration. Our specialized high-voltage example illustrates why the complete assembly matters. Review these conditions with Honza Group before carrying requirements into the project documents.
Use these examples to start the conversation with your project team. Each specification needs to reflect the roof and the work planned. You do not need a finished specification before contacting Honza Group.
Resolve Access and Covering Requirements Early
A membrane that will receive vegetation, ballast or another covering needs a testing plan that accounts for the construction sequence. For high-voltage ELD, plan for access to the exposed membrane and a dry test surface. Involving Honza Group early allows testing, repairs and verification to be coordinated before the membrane is covered.
If the roof is already covered, discuss access and investigation needs with Honza Group before carrying an exposed-membrane testing scope into the specification. Existing overburden can change what is feasible and how the investigation should proceed.
Review the Assembly Before Choosing Materials
Where an additional conductive medium is needed, review the complete assembly with Honza Group before specifying materials. The membrane manufacturer’s requirements and the proposed high-voltage testing procedure should inform that coordination. Our specialized-assembly example illustrates why these details need project-specific review.
The project-specific specification should reflect that coordination. Naming a material alone does not resolve how the assembly will be tested or how its suitability will be verified.
Define the Report Before the Work Begins
The report is part of the service your specification should define. Honza Group’s high-voltage examples address roof plans, breach photographs and repair verification. Project-specific requirements should also make clear how tested areas, exclusions and outstanding repairs will be documented.
Our sample report shows how scope, site conditions, breach locations and repair status can be presented. Use the example to identify the records your team needs for construction coordination and closeout. The status of any unverified repairs should remain clear.
Match Standard References to the Proposed Procedure
ASTM D7877 is a guide to electronic leak detection methods. A high-voltage specification should identify the proposed procedure and requirements that apply to it, rather than carry forward language written for a different testing method.
Align testing requirements with the proposed high-voltage procedure and actual roof conditions. Confirm the applicable standard edition during project coordination rather than carrying a reference forward unchanged from an example.
Discuss Your Roof With Honza Group
Preparing project documents or reviewing an existing ELD requirement? Share your roof plans, assembly details and project goals with Honza Group. We can help determine whether high-voltage ELD fits your roof and develop a project-specific testing specification that addresses feasibility, coordination and the documentation your team needs.
Frequently Asked Questions
When should we involve Honza Group?
Ideally, while the roof assembly and project specifications are being developed, before bidding and before components are concealed. Early coordination creates an opportunity to resolve testability, access and future-testing needs. If the project is already underway, share its current stage so we can discuss the available options.
What if our project already includes an ELD specification?
Bring the existing specification and roof details to Honza Group. We can review whether the testing scope reflects the proposed assembly, site conditions and project objectives and identify requirements that need clarification with the design team.
What information should we provide to get started?
Send the roof plan, available assembly details and membrane product information, along with the project stage and anticipated schedule. Tell us whether the roof will be covered and whether later testing is an owner priority. If some details are still undecided, identify those so they can be addressed during coordination.